- CALL US TODAY: 0191 258 0000
- 24/7 - 365 DAYS
SWH GROUP
Building Solutions - Asbestos
Are you looking for skilled domestic & commercial plasterers in the North East?
Call today: 0191 258 0000
WE NOW OFFER FINANCE - SPREAD THE PAYMENTS
Asbestos Removal (non-licensed) - artex
Most higher risk work with asbestos must only be done by a licensed contractor but at SWH we are able to undertake the safe removal of non-licensed material and have fully trained operatives who have many years of working with asbestos material.
EXAMPLES OF NON-LICENSED WORK WITH ASBESTOS
- Cleaning up small quantities of loose/ fine debris containing ACM dust (where the work is sporadic and of low intensity, the control limit will not be exceeded and it is short duration work)
- Drilling of textured decorative coatings for installation of fixtures/fittings
- Encapsulation and sealing-in work on asbestos-containing materials (ACMs) that are in good condition
To be exempt from needing a licence the work must be: Sporadic and of low intensity – to be considered sporadic and of low intensity the concentration of asbestos in the air should not exceed 0.6f/cm3 measured over 10 minutes
- Carried out in such a way that the exposure of workers to asbestos will not exceed the legal control limit of 0.1 asbestos fibres per cubic centimetre of air (0.1 f/cm3) (averaged over a four hour period)
- Meet at least one of the four following conditions:
- It is a short non-continuous maintenance task, with only non-friable materials (friability describes how likely an ACM is to release asbestos fibres when worked on, so non-friable materials will only release a small number of fibres during work); or
- It is a removal task, where the ACMs are in reasonable condition and are not being deliberately broken up, and the asbestos fibres are firmly contained within a matrix, eg the asbestos is coated, covered or contained within another material, such as cement, paint or plastic; or
- It is a task where the ACMs are in good condition and are being sealed or encapsulated to ensure they are not easily damaged in the future; or
- It is an air monitoring and control task to check fibre concentrations in the air, or it’s the collection and analysis of asbestos samples to confirm the presence of asbestos in a material.
- It is a short non-continuous maintenance task, with only non-friable materials (friability describes how likely an ACM is to release asbestos fibres when worked on, so non-friable materials will only release a small number of fibres during work); or
WORKING WITH
SWH GROUP FOR THE FULL PACKAGE
Customers reviews
WHAT OUR CUSTOMERS ARE SAYING
A service you can trust
At SWH Electrical Solutions we work together with our clients to ensure every electrical installation project is completed on schedule and within budget. Check out our customer reviews throughout the site.
SWH GROUP FOR THE FULL PACKAGE
24 Hour Call Outs
SWH Group providing Electrical and Building solutions to a wide range clients in domestic and commercial sectors. Call us today...
0191 258 0000
© 2022 All rights reserved - SWH Group
Telephone: 0191 258 0000